Interview:
Pure West – Christie’s Great Estates
Q. What brought
you to the Bozeman area?
A. Montana State University, love of the outdoors and related
recreational opportunities. I had created and operated a large
competitive Bid-Build Commercial Construction practice in Ann Arbor,
Michigan (200 plus employees at a high point), and after fine tuning
the organization, the lack of an ongoing challenge gave me pause and
time to reconsider my career path.
After a few family vacations to Montana, we decided to move to
Whitefish in 1991. It was there when serving as an Owners
Representative to a large school remodel/expansion project that I
became eager to formally blend my construction experience and
creative interest as an Architect. Not wanting to leave Montana, I
became aware of Montana States well respected Architecture program
and we quickly relocated to Bozeman in 1992.
We remained in Bozeman for approximately 10 years; life’s
circumstance brought us reluctantly back to Michigan for a period of
time. Our love of all things Montanan has now brought us back full
circle to our adopted home state.
Q. What is the approach to your craft?
A. My approach is to carefully balance the needs of budget,
programming and the sensitivities of place or location. I like to
share with my clients that Architecture is similar to music; in
other words what would you like to hear or see? Let’s pick the
vernacular and then talk about volume. For instance we may talk
about “Mountain Rustic”, but as such there is not a one size fits
all approach to this vocabulary. One client may be visualizing
something that is close to say turn-of-the century (loud) and
another may be thinking accents of rustic with perhaps more modern
finishes (soft). It’s all in the range of how one prefers to feel or
hear his or hers particular preference, vocabulary or song.
Continuing, in my opinion there are three things that define great
design…they are: Site Specificity, a Sense of Transparency and
Expression of Structure; like a three legged stool the absence of
any one leg and the project won’t stand up to curb-side scrutiny.
Lastly, it
is important to remember that Architecture is an expression of art
rooted in technical competency. It is important for me to feel a
sense of place, to be inspired by the context of location; often
times it can be the subtle little things of place that speak the
loudest. Think of it this way…a lot of people can play a piano, but
how many can move you to tears. Technical competency alone will not
add value or interest in a built solution.
Q. Can you discuss past projects and designs?
A. Michigan seems to support a straight line approach to need; in
other words most design commissions available are about adaptive
reuse, commercial, institutional and like work opportunities. This
is not to say that a higher level of design is not valued, high
design is appreciated in all walks of life. It’s just that the
opportunity to focus on the Art of Architecture is rare in certain
areas of our country. My love for the west actually resulted in our
“Faithful” brand series or concepts.
It was kind of like this; I am a fly fisherman and like any good fly
fishermen, we often times enjoy our sport more so for the process
and place that we experience. Faithful began that way; as wanting to
be faithful to a place and a remembrance, I began to doodle in my
spare time. Those doodle’s or in the passion of place and art
eventually found its way to some very capable people. I suspect they
sensed something in me that that was sincere and genuine, I call it
Montanan. Combined with a love of place, competency and the ability
to administer their better interest, I have been extended some
unique opportunities.
Most
notably Headwaters Camp; which included Master Planning, Aquatic
Development, infrastructure, Geothermal Pond Looping, Solar Arrays,
Cabin(s), Horse Barn and a significant Primary Residence. The first
of three Guest Cabins proposed has been honored at the highest level
by the US Green Building Council; and a significant National Award
utilizing a different set of criteria that will be announced
publicly for this same project in March. As an obscure and fairly unknown, these
recent recognitions are pretty exciting stuff. Incidentally we were
measured and contrasted to a number of well known Architects for
this special and unique project assignment; I am very humbled and
appreciative to have been extended the opportunity we were given.
Q. Tell us about Beaver Creek, Faithful and the Grizzly Ridge Lodge?
A. Beaver Creek Cabin started as a sketch rendering of a high end,
High Mountain Cabin requested by Rustic Book author Ralph Kylloe.
Since our publication in the Big Sky Journal, we have received
inquires of interest for this Cabin from Southern California,
Jackson Hole and Texas. It will be interesting to work on the
Owner’s requested programming, remaining elevations and see where it
ultimately ends up actually being constructed.
The Faithful - Home came very close to being constructed in the
Yellowstone Club; however instead we delivered a different look and
much larger program, on a very unique ski-in, ski-out parcel. Our
Faithful – Home continues to inspire others and has led to other
project opportunities reflecting individual owner wants and desires.
The Faithful - Lodge is a franchise opportunity for a Rustic
Structure of accommodating proportions and western character. There
is a huge demand for destination places of substance and experience
and our Faithful Lodge Franchise has the potential to become a
Coast-to-Coast phenomena. To drive home this point, when you see
people flocking to Bass Pro Shops and Cabela’s to eat, meet and
marry the demand is very transparent. Michigan with all of its shore
lines, Great Lakes and Mackinaw Bridge takes a back seat to the
number of visitors ascending in record numbers on a retail center
that has now become the number one tourist attraction in the State.
This retail outlet allows but a glimpse of a real Rustic–Western
experience. Not everyone can travel to the Rocky Mountain West and
our urban centers are begging for this built acknowledgement. Our
Faithful Lodge is a reflection of interest and desire to position
ourselves as a provider to a National demand for a quality
destination facility. Presently we are organizing concepts for
equity investment partnering.
Grizzly Ridge is a high-end custom home that was originally designed
for a client that has since evolved into a second iteration of
development and appearance. This particular client has made this
first design response available to the public through our services.
A one time purchase of completed plans is available and can be
modified to suit ones particular taste and want.
“Jason, thank you so much
for including us in your Pure West website.”
back to top
|
Interview: Big Sky
Journal - Mountain
Living &
Architectural Design
Magazine, Fall 2009
Q & A – Headwaters
Camp
Q.) What were you
trying to achieve
architecturally when
designing Headwaters
Camp?
A.) First and
foremost Owner
satisfaction;
understanding hopes
and aspirations is
very important and
certainly a
prerequisite to the
creative response.
No less significant
is the location
itself; it is
imperative for me to
feel the site on a
very personal and
emotional level
before tasking on a
solution; sights,
smell, sound,
texture, sun, wind,
wildlife,
vegetation, etc. all
are allowed to be
absorbed by the
inner person. I
develop a very
personal
relationship with
place and location
before allowing
myself to move
forward with a
solution.
Architects Journal
Entry – November
2008: “…Words cannot
possibly begin to
convey a feeling or
emotion well enough
to be shared or
understood by
others. How does one
capture the sense of
place, song, passage
or remembrance that
moves the heart or
soul? Such things
are often deeply
personal and occur
in a moment of
silence; the kind of
silence I had
experienced while in
the palm of…”(see Architects Journal
Entry for the entire
journal entry.)
Specifically, the
strategy behind the
Master Plan was to
create an
encampment. The kind
we all remember as
children when for
two weeks during the
summer we would bunk
with new found
friends, explore our
surroundings and
enjoy a unique mix
of liberty and
freedom. Distilled
to the basics,
Headwaters Camp is
about a series of
experiences,
preserving
sightlines, locating
building envelopes
and thinking about
their relationship
to each other.
Within this context
the crown jewel; a
substantial series
of ponds, streams,
falls and wetlands
help to unify the
entire concept.
Often times in rural
Montana the
outbuildings are
seen or experienced
before the dwelling;
Headwaters Camp is
no different. From
the main road a
romantic notion of
place is gathered by
an over-the-shoulder
preview of horse
pasture and a high
mountain barn;
finished with
beautifully
weathered, reclaimed
materials of wood,
timber and
corrugated roofing.
A single point of
parcel entry allows
for opportunities to
pause and stand
silently in
wonderment and
curiosity as to what
lies beyond.
Transitional pieces
such as a bridge
help to create a
sense of departure
and arrival.
Avoiding existing
meadows, water ways
and placement of
access lanes to the
inside of a forested
edge helped to
preserve the feeling
of minimal intrusion
upon the land. Mr.
Thomson (Todd) was
very specific about
setting up a visual
relationship from
the future primary
residence to the
distant summit of
Lone Mountain. In
particular from the
great room, the need
to experience the
pond in the
foreground, oblique
view of a cabin
shimmering over the
waters edge beyond,
each embraced by
Lone Mountain seen
in all its glory
along a distant
horizon.
Q.) What were the
owner’s requests
and/or needs of the
home?
A.) Todd and
Melissa’s request
was for an efficient
Guest Cabin that
contained the needed
programming for
serving the everyday
necessities of life.
The Cabins character
was to be what is
termed Parkitecture;
or the more popular
and contemporary
definition known to
many as
Western/Rustic.
Parkitecture by our
definition is the
exaggerated use of
boulders and stone,
large expressive
tree trunks for
columns, log beams,
trussing and a mixed
use of timbers.
These elements of
the structure appear
to be emerging or
growing from the
earth itself. Mr.
Thomson was very
clear about
capturing distant
views deep within
the space and that
there be an iconic
stairway leading to
the upper level
loft. At the end of
the day, the
resulting structure
was the culmination
of inspiration,
place, program and a
collaborative
contribution made by
Owner, Architect and
Contractor alike.
Q.) How would you
describe the home’s
feel?
A.) Special,
organic, original,
well rooted and
appropriate to
place. The Cabin and
the Barn for that
matter, each convey
strength, permanence
and a sense of
confidence amongst
an overwhelming
panorama of majestic
mountains and
weather extremes. If
you reduce to words
the definition of
successful
architecture you
will discover three
essential
characteristics,
they are: Expressive
structure
(experiencing
working members,
detailed
connections, inside
and out), site
specificity (plugged
into the site in a
very specific
manner), and a
feeling of
transparency (open
air connections,
large window
openings, etc.). In
comparing the Cabin
to this measuring
stick we hit a home
run.
Q.) At only 1,900
square feet, what
special challenges
were encountered
designing for that
space?
A.) Actually the
Cabin is defined by
a 1377 sf foot print
which excludes the
loft and detached
storage, mechanical
space. This is a
great question; to
the average person
the prevailing myth
is….the smaller the
project the easier
it is to design,
when in fact just
the opposite is
true. A small gem of
a structure that
succeeds at all the
things that I’ve
touched upon is very
difficult to
achieve. Thinking
about how the
structure would
utilize a natural
drop in elevation or
a descending
topography to waters
edge was fun and a
rare project
opportunity. Our
Structural (Bridger
Engineers) and Civil
(Allied Engineering)
both from Bozeman,
were a great asset
during their
respective phase of
service.
Q.) How is designing
a “green,” LEED-certified
home different than
a typical assignment
for you?
A.) The big
differences are in
the control of the
owner and
contractor. Todd’s
commitment to the
process and the many
requirements
necessary to achieve
LEED Platinum was
extraordinary;
certification would
not have been
possible without Mr.
Thomson. The
contractor Highline
Partners sought good
advice and direction
from LEED
consultants Kath
Williams and
Associates. Highline
also converted hard
copy check listing
to a web based
format and followed
through on many of
the details required
to achieve the mark.
Again, certification
would not have been
possible without
Highline Partners
commitment to the
process and
execution of the
many details and
variables involved.
Aside from the
previous mention, we
as architects are
always thinking
about building
orientation,
adaptation to site,
weather extremes,
passive solar, code
compliance and
energy efficiency
standards. Really
what makes this
project so special
was the commitment
on behalf of all the
parties to push
Headwaters Camp to
the next level that
currently has no
equal.
Q.) Is this the
first home you have
designed to achieve
LEED certification?
A.) Yes; however
design or a
particular
vernacular is less
critical to the
achievement of a
LEED Certification
than say the
efficiency of the
building envelope
and other systems
supporting the use
of the dwelling.
Incidentally, I wish
to acknowledge our
consultant to the
Geothermal Heating
System/ Pond Loop,
Major Geothermal
located in Wheat
Ridge, CO.
Q.) What trends have
you noticed in
people’s decisions
to adopt a more
“green” building
sense?
A.) Green is red
hot! Everywhere, in
all walks of life
there is a renewed
excitement and
determination to
become good stewards
of our remaining
resources and to
develop technologies
for sustainable,
renewable energy. We
are poised as a
nation to do great
things; not only do
we have the
opportunity to
deliver ourselves
from a dwindling
petroleum dependant
system, but to also
create new career
paths and other
related jobs
currently needed to
bolster our economy.
We can provide
opportunities for
our country in a way
not seen since the
automobile was first
massed produced in
Detroit and believe
it or not, it starts
in our own back
yard! It seems that
at a time of our
greatest
desperation, great
things are achieved.
I have faith in our
country, our
technologies, our
educational system
and in our future.
“Green” is beyond a
trend, it’s here to
stay, and if you are
a business leader
just beginning to
think about
green......you are
already behind.
Q.) What is the
outlook for new
housing; is now a
good time to build?
A.) Many experts
have looked at every
possible housing
indicator you can
imagine and the
statistic that seems
to be most relevant
to business leaders
is private, fixed,
residential
investment as a
percent to the GDP.
Reportedly the 60
year average is
4.8%. According to
Home Depot’s CFO,
Carol Tome, at the
height of the
homebuilding market,
that number stood at
6.3%; at the end of
the first quarter of
2009 the number
equaled 2.7%;
obviously indicating
a huge contraction.
Also according to
Tome, when you
compare 2.7% and 60
years of data it is
logical to assume
the worst is behind
us. In conclusion
she reminds us that
the contraction
could continue,
however a serious
decline as we have
experienced should
be over. (Fortune
Magazine – August
2009; Renovating
Home Depot; pg 46)
Bottom line, we are
sharing with our
clients who are
poised to move in a
soft market, to take
advantage of pricing
not seen in a
decade. A home is an
investment;
investments are
idealized when
purchased low and
sold high. It would
appear that we have
reached the bottom
end of a declining
economy, so now is
the time to build.
back
to top
|
SELECTING A SITE AND GETTING TO KNOW AN ARCHITECT
You have
just purchased the place of your dreams, the views are spectacular
and the possibilities seem endless. You want to protect your
investment and to fully realize your hopes and aspirations. Perhaps
you are ready to hire an architect….but which one, why and what kind
of service should you expect? While I could write an entire book on
this topic alone, I’ll begin by hitting upon just a few key points;
helping you along in a process that may otherwise seem intimidating.
Asking that an architect walk a parcel or two before your final
purchase is perhaps one of the most overlooked opportunities that I
know of. A casual stroll over a plot of land allows you to measure a
number of variables: the architect’s temperament, personality,
competency, communication skills, artistic vision, passion, respect
for place and a holistic, educated, informed opinion about location;
helping you to arrive at that next level of decision.
For larger tracts of land (multiple acres), the best opinions will
generally come a few days later; after the many possibilities have
had a chance to cook….or reduce to the essence of place. If
available, be prepared to offer a topographic plot of the parcel or
an aerial illustrating property boundaries, adjacent improvements,
etc. before walking the land.
HOW TO COMMUNICATE YOUR WANTS
Architecture is technical competency expressed as art. Competency
alone will not guarantee you of a successful solution; however an
artistic professional may very well achieve something remarkable.
Look for passion, sensitivity, reservation, a quite soul that will
allow themselves to be absorbed by the intangibles. When expressing
your project to an architect….think about how a radio works. In
other words when discussing a vernacular or architectural
vocabulary, dial in on the channel you would like to hear…say Modern
Mountain, Western Rustic, Post & Beam, Craftsman, perhaps a mix of
two or more and so on. Then think about volume, how loud would you
like to hear the music? Just like the volume knob on a radio, you
can turn up or down the variables of design and character to suit
personal taste and budget.
YOUR ROLE IN THE PROCESS
Once you have decided on
which architect to hire, execute your understanding of fees and
services with a Standard AIA Owner-Architect Agreement. AIA
Agreements have withstood the test of time, are impartial and have
proven to be the best document available for defining the
obligations of both parties. Have your attorney review the agreement
before endorsing the final contract.
Before beginning the first phase of activities with your architect,
have a topographic survey for your parcel prepared at 1’-0”
increments and anything else your architect may request. Such
surveys should include easements, setbacks, utilities, building
envelopes, compass bearings of near and distant views, improvements
and alike noted and illustrated plainly on the document. You’ll want
a “boots on the ground” survey, commonly referred to as a field
survey. Do not trust aerials as a sufficient tool for understanding
much of anything; other then a rough idea of the property lines. Now
is not the time to save a few bucks and an inaccurate survey can
cost you big time later on. Do not expect your architect to provide
survey services, the liability associated with this practical need
cannot be justified.
If you haven’t already ordered a geological survey of the bearing
capacity and underlying geology of the site before purchasing the
parcel, then you will need to under take this task next. Your
architect will want to understand the particulars of the proposed
building envelopes and the required built solution response to each
unique location. The idea is to avoid differential settlement and
perhaps if located in mountainous terrain, the avoidance of below
grade obstructions, etc. Again, do not expect your architect to
provide this need to service. However in each case (surveys and
geotechnical reports), your architect can be helpful by providing
you with reputable companies, approximated costs and contact
information.
THE BUILT RESPONSE
Early on you will want to consider how to manage the built response.
Because the many advantages…Design-Build has exponentially become
one of the most desired methods for project delivery. Design-Build
is by where the architect will contractually provide all services;
from concept to completion. Typically, the architect will engage a
pre-qualified general contractor and provide as “Single Source”
accountable, professional services, construction management, project
budgets, allowances, progress review and delivery of the final
product. As always exercise good judgment; not all architects will
be qualified as capable in delivering this level of service. Discuss
your architects experience, capacity and understanding of the
process. (please see Design-Build link below)
The alternative to Design-Build will be to engage for the built
response directly with a reputable general contractor; the architect
in return would be designated as the projects construction
administrator. Under this type arrangement each entity will report
to you directly for the services provided. Again AIA Standard
Agreements are available for your use. Either way, insist that
budgets be respected and quantified for each level of the evolving
design.
PROFESSIONAL SERVICE
TASKING
Each architect will possess their own way of tasking through
schematic design and design development; however each will need to
gather the stats: budget, site improvements, square-footage,
programming, captured views, building vocabulary, etc. Sketch
renderings of elevations and floor plans will assist you with
understanding that the tones of the architect’s intention, are
demonstrating a working comprehension of your preferences.
Design Development is generally your last chance to direct changes
before entering into the preparation of the Construction Documents.
Construction Documents are the blueprints of your final built
solution. It is the responsibility of the architect to provide all
consulting services (structural engineering, civil engineering,
mechanical, electrical, plumbing, geothermal, specialty and alike),
necessary in the preparation of the construction document. I prefer
that consulting fees be separate from the architects, so that when
comparing services of another, it is plainly evident what the costs
are. Afterwards, a competitive solicitation of supporting services
can be shared with you and a simple overhead and profit margin
applied upon the final selection. Final selection of consulting
service can be made under a joint review performed by owner and
architect alike, with preference given to the best qualified
respondent. The owner should yield to the architect’s qualified and
professional judgment; however the architect must be prepared to
make the case as to why or why not a particular consultant is to be
considered. An owner should never engage consulting service directly
and will be discussed further under “Chain of Accountability”.
IT’S ALL IN THE DETAILS
The architects Construction Documents must be sufficiently detailed
as to help avoid Change Order extras that may arise in the absence
of ones ability to quantify all work entailed. Missing detail is
often the reason for escalating project costs and with some effort
during the architect’s Con Doc phase of service, building costs can
be held in check. Elaborating, while there is no one formula on how
much architectural detailing will be enough….too little often means
more profit for the architect and a built solution that will be
delivered at a premium cost to you.
ACCOUNTABILITY
Now let’s talk ‘Chain of
Accountability”…far too often over zealous owners and builders alike
are quick to allow changes with substitutions of materials, inferior
standards, means, methods or in other words to compromise
performance and safety criteria of an approved and specified
requirement, for a perceived savings. The very moment of this
occurrence, a snowball effect of liability is placed upon the
shoulders of the party breaching the architects approved standard.
Some changes may result in nothing more then a cosmetic difference,
while others could result in catastrophic failure, exponential cost
in remedy, or in a worse case scenario…loss of life. Maintain a
Chain of Accountability for which the architect is insured. If a
change is desired, discuss it with your architect and have a Change
Order (add or deduct) issued for the want. This process will keep
everyone accountable, informed and most of all protected.
As always Dan Joseph Architects is ready to serve your needs; give
me a call….I would enjoy meeting you, walking the site and
discussing my process of bringing you the best in Professional
Services.
POINTS TO REMEMBER
1. Asking an Architect to walk your parcel(s) will help with
understanding the potential of multiple locations, while also
providing some feed-back regarding the Architect themselves.
2. Architecture is technical competency expressed as art. Competency
alone will not guarantee you of a successful solution; however an
artistic professional may very well achieve something remarkable.
Look for passion, sensitivity, reservation, a quite soul that will
allow themselves to be absorbed by the intangibles.
3. DO NOT USE AERIAL SURVEYS WHEN ACCURATE INFORMATION IS REQUIRED.
4. Early on you will want to consider how to manage the built
response. Because of the many advantages…Design-Build has
exponentially become one of the most desired methods for project
delivery. Design-Build is by where the architect will contractually
provide all services; from concept to completion. (see link below)
5. Request that consulting
fees be separate from the architects, so that when comparing
services of another, it is plainly evident what the costs are.
6. The Construction Documents must be sufficiently detailed as to
help avoid Change Order extras, that may arise in the absence of
ones ability to quantify all work entailed.
7. Maintain a “Chain of Accountability”; require that all changes…on
any level, be managed by Change Orders (adds, deducts and even if
there is no difference).
Click on the link below to view Design Build attachment:
http://www.djawest.com/Des
ignBuildBrochure.pdf
back to top
|
LEED THE WAY…A SNAP
SHOT OF USGBC
CERTIFICATION
The built response
has a significant
impact on our
quality of life, the
natural world,
health, economy and
productivity.
Consistently, new
building means and
methods,
technologies and
equipment are
available to
architects and
owners alike who
want to build in a
responsible
manner...benefiting
from economic and
environmental
performance.
The US Green
Building Council
through a LEED
(Leadership in
Energy and
Environmental
Design)
Certification
program has rapidly
transformed the old
way of building
structures into a
celebration of
performance based
achievement. Through
a process of third
party verification,
a long list of
completed tasks are
assigned a point
value that upon
tabulation, will
recognize the
structure as either
Certified, Silver,
Gold or the highest
achievement
Platinum. Credits
towards
certification are
earned in each of
the following
categories:
Sustainable Sites,
Water Efficiency,
Energy and
Atmosphere,
Materials and
Resources, Indoor
Environmental
Quality, Innovative
Design, and others
depending on your
building use and
designation.
THE PROCESS
So exactly what is
the next step for
those desiring LEED
Certification? It
actually begins with
a commitment from
the owner; in the
big picture of
things the owner
makes all things
possible. Next…your
architect needs to
think critically
while delivering
good passive
techniques, planning
and design for high
performance
standards. No less
important are the
buildings support
systems, including
state-of-the-art
HVAC, lighting,
controls and other
technologies that
will improve the
performance of your
structure.
Concurrently and
during the design
phase of service,
your architect will
assist you with the
selection and
engagement of a
Certified LEED
Consultant or
Provider. Providers
play a very
important role in
the over-all
process, which
unfortunately at
times are quickly
forgotten upon
making the mark. As
third party
verifiers, it is
very important that
the Provider be
contractually
accountable to the
owner only, not the
architect or
contractor; allowing
for unbiased reviews
of the completed
work that will be
documented and
shared with the
owner and the USGBC.
Additionally,
Providers offer over
shoulder review of
the evolving design
and later contribute
critical direction
during the
construction
process. Lastly,
your contractor must
competently execute
the plans and the
various lists of
assignment required
to successfully meet
the objectives.
It is important to
note that
registration, use
and access of the
“Final Check List”
are controlled by
the owner; again…not
the contractor,
architect or even
the USGBC; so make
sure that the final
registration is in
the owners name
exclusively.
CONCLUSION
While it is easy to
over-simplify the
process, achieving
LEED Certification
is a commitment
whose thread can be
traced from concept
to completion,
requiring months or
years of diligence.
As we move towards
Net-Zero Buildings,
the USGBC–LEED
program has cleared
a path for
sustainable practice
and continued reform
for much of the
built environment.
Utilizing LEED
criteria, energy
codes and building
efficiency
standards, Dan
Joseph Architects is
ready to assist you
with LEED
Certification. Give
us a call…
POINTS TO REMEMBER
1. Construction
means and methods,
technologies and
equipment are
constantly being
updated.
2. LEED
Certification for
new projects is
available through a
process of third
party verification
of completed tasks.
3. Your architect
needs to think
critically while
delivering good
passive techniques,
planning and design
for high performance
standards.
4. As third party
verifiers, it is
very important that
the Provider be
contractually
accountable to the
owner only, not the
architect or
contractor.
5. Contractors must
competently execute
the plans and the
various lists of
assignment required
to successfully meet
the objectives.
6. Registration, use
and access of the
“Final Check List”
are controlled by
the owner…not the
contractor,
architect or even
the USGBC; so make
sure that the final
registration is in
the owners name
exclusively.
7.
The USGBC–LEED
program has cleared
a path for
sustainable practice
and continued reform
for much of the
built environment.
back
to top
|
CONSTRUCTION
CONTRACTS-OWNERS RISK
Often times
I am approached by friends and prospective clients that are in need
of explanation, direction or supplemental information on how best to
engage a contractor. While this topic is much more inclusive than
what can be shared within this brief informational, a graph-link
found at the bottom of this discussion will help to assist in
understanding the risk involved relative to the Construction
Contract selected.
Basically, different types of construction contracts can be broken
or divided into two large groups. One group includes those contracts
for which the owner selects a contractor based on competitive
bidding; the other in which the owner negotiates a contract directly
with the contractor.
Summarizing, a competitive environment fosters the best price and an
efficient construction schedule. Risk of claim or a dispute can be
greatly diminished by issuing comprehensive supplemental conditions
and by understanding how to control other associated project costs
not well defined by the construction documents: weather protection,
below grade obstructions, utilities, allowances, and owner driven
change orders or extras.
As always, Dan Joseph Architects is available to assist you with
understanding the many options possible, implications and risk
associated with any preferred method, including: Lump Sums, Unit
Price, Competitive Bid, Special Reimbursable, Contractor Fees, Cost
Plus-Percentage of Cost, Cost Plus-Fixed, Incentive Fee Contracts,
Guaranteed Maximum Price and Design Build.
COMMON METHODS OF CONTRACTOR SELECTION
Competitive
Bidding - By where Contractors have been pre-qualified based upon
experience, reputation and capacity to serve; award would go to the
"lowest responsible bidder" qualified to complete the job in
accordance with the terms of the contract.
Negotiated Contract - By where a Contractor has been hand picked
based upon experience, reputation and capacity to serve; candidate
is assumed to be qualified to complete the job in accordance with
the terms of the contract.
Cost Plus Fee Contract - Contracts of the cost-plus-fee variety are
used where, in the judgment of the owner, a fixed-sum contract is
undesirable or inappropriate. Cost-plus contracts are normally
negotiated between the owner and the contractor. Most cost-plus
contracts are open ended in the sense that the total construction
cost to the owner cannot be known until completion of the project.
Cost Plus or Time and
Material agreements should be thought of as "on the clock"
arrangements that if used exclusively, may reduce the incentive to
manage closely the work at large, resulting in inflated budgets,
unexpected cost(s) and extended schedules. However, when used in
conjunction with Competitive Bid Contracts, there are benefits to
limited hourly tasking that at times will prove to be useful for
managing project cost.
POINTS TO REMEMBER:
1. Competition fosters the best price and a timely
completion of your project.
2. Limit disputes by making sure that your architect issues
Supplementary Conditions with the Bid Set for items not well defined
in the General Conditions: weather protection, below grade
obstructions, utilities, allowances, supervision, clean up,
dumpsters, schedules, equipment rentals, other responsibilities,
insurances requirements, safety programs, RFI’s, etc., along with
owner driven change orders (adds & deducts).
3. Understand the common methods of Contractor Selection and the
attached graph for implications.
Click the link below to view the Construction Graph:
http://www.djawest.com/con
stgraph.jpg
back to top
|
SELECTING A
CONTRACTOR: THINK
AGAIN…THINK DESIGN
BUILD!
Construction
delivery is changing
before our very
eyes. Design–Build
previously known as
just another option
to the built
solution may now be
the most preferred
method of the built
response. The old
method in the
separation of design
and construction is
not the standard in
many other more
complex and cost
driven industries.
Why then until
recently has there
been a separation in
building design and
the construction
process?
Well, formally and
until just 32 years
ago (1978), the
American Institute
of Architects (AIA)
Code of Ethics and
Professional Conduct
suggested that
architects should
not be allowed to
participate in the
construction process
of any project,
including
design-build project
delivery. Now
repealed, owners are
now choosing
design-build for a
number of good
reasons (see
attachment link
below), including:
Single Source for
Design and
Construction,
Quicker Project
Delivery, Guaranteed
Project Pricing,
Minimized Claims and
Damages, Extended
Product Warranties.
Further,
Design-Build keeps
the appropriate
stake holders
involved in the
process from concept
to turn-key, by
formally integrating
all entities into a
simplified
contractual
agreement of “Single
Source
Accountability.”
ARE ALL ARCHITECTS
CAPABLE OF PROVIDING
SINGLE SOURCE
DELIVERY SERVICES?
The standard
prerequisite is
experience, capacity
and diligence;
therefore it is fair
to say that not all
Architects are equal
in delivering a
Design-Build
service. However,
the risk of taking
on a professional
practitioner that
lacks experience in
the built response
can be greatly
diminished by
insisting that the
Architect
pre-qualify and
collaborate with a
well respected and
capable Construction
Manager.
WHAT QUALIFIES A
CONSTRUCTION MANAGER
AS CAPABLE?
As in any endeavor a
successful track
record over a number
of years is an
important benchmark;
but no less
important is the
utilization of a
proven process and
the comprehension to
a number of related
topics including:
Costing of
Preliminary Design,
Design Development
and the final
Construction
Document (Uniformat, WBS, Master Format), including
Request for
Information (RFI’s),
General Conditions,
Allowances,
Equipment Rentals,
Estimated Costs,
Solicitation of Bids
(RFP’s), Self
Performance, Cost
Plus Work (T&M), Pay
Applications, Change
Orders, Wavier of
Liens, Sworn
Statements, Project
Scheduling, On Site
Supervision, Safety
Program, Owner
Review
Documentation-Disclosures,
Insurance, Bonding
Capacity and other
similar relevant
matters.
VERIFY, VERIFY,
VERIFY
Long gone are the
days of Cost Plus
services, when it
was sufficient to
enumerate a list of
activities that
equaled an owner
proposed budget.
Project expenditures
can equal millions
of dollars and each
listed item of
service or expense
must be verifiable
in both quantity and
unit cost modified
to equal regional
norms.
Believe it or not
there are still some
contractors in the
industry that will
start with a
proposed budget
under a “Cost Plus”
and will quickly
allocate by
percentage to
multiple pages of
cost, with no
verifiable means in
which to support the
data of expense
shared. Simply
stated, if the line
item is not
quantified, it is
not valid, should be
held as suspect and
is likely erroneous!
Engaging a process
that is not
verifiable results
in one of two
outcomes; the first
is in the
proclamation that
the final cost is
under the overall
budget. Such a
declaration is
meaningless; with
some diligence in
review, it will be
revealed that while
some line items are
much less then
anticipated, many
more are
over….either way the
owner will likely
have paid much more
then the value of
the total work
provided in a game
of pushing numbers
to match an
inflated,
unverified,
misrepresentation of
expenditure.
The second possible
outcome of an
unverified process
of project delivery
is a long parade of
Requests for Change
Orders. Change
Orders can either be
for deductions
(reduced scope of
work, substitution
of means, methods or
materials), or for
adds. The emphasis
here is Change Order
Adds or a Request
for Change Orders
that inflate the
final contract
amount. If the
unverified sum
proposed is
undervalued, say due
to an error of not
pumping the number
high enough for a
safe outcome, the
result will be in
the form of a
dreaded Change
Order.
So take
note…predictable
project expenditures
will require
consistent,
verifiable means of
back checking; and
in the absence of
quantifiable
measures, your final
project cost will
most certainly
exceed your
expectations.
(Please note that
some Change Order
Adds are legitimate,
such as: Owner
driven requests for
change, unknown
below surface
conditions, missing
detail, etc. and
will not be expanded
upon during this
brief discussion.)
THE PERFECT STORM
By example here is
one scenario that
you should avoid at
all costs.
The contractor is
charming, energetic,
articulate, they
also appear to be
competent and have
completed a few
projects in the
area; in fact they
may have even been
introduced by an
acquaintance or
friend that was
introduced to the
contractor in the
same unsuspecting
manner.
Accomplishments are
often times exaggerated, as they
confidently offer to
cost out your
project. Within a
few days or sooner
they will have
quickly presented
you with an
estimate, likely
well before any
other reputable
contractor and at a
price that appears
to be competitive.
Interested, you
invite them back for
another discussion.
During this meeting
you may feel a
little rushed; as
the contractor talks
about pending
weather, a backlog
of work or perhaps
that labor and
material pricing is
at an all time
low…”now’s the time
to act” you are
told. During your
discussion a budget
that appears very
well organized and
detailed, over many
categories and a
number of pages is
pushed across the
table. In your
review it appears to
all be all accounted
for, plainly stated
and best of all the
contractor has
offered to perform
this work on a cost
plus basis.
Cost Plus you are
told is by where all
work is completed
for the submitted
cost and a
reasonable margin
will be added to the
bill later for
overhead and profit.
You talk about the
margin of mark-up
and settle on a
percentage that
works well for both
parties. During this
meeting or perhaps
later on you are
presented with an
agreement
where
the basis of payment
is "Cost of the Work"
plus a fee and there
is no “Guarantee of
Cost”. Wow what a
deal…you are only
going to pay for
cost and a small
margin of mark-up to
oversee your
project!
At this point you
willingly sign the
agreement, pay the
deposit and work
commences. However
upon the first pay
request some of the
costs have been
exceeded and
suddenly you are
confronted with
requests for Change
Orders (a formal
document that
inflates the
contract sum). After
several months into
construction a
pattern of busting
budgets and
requesting change
orders is well
established. You are
told that while some
items have exceeded
expectations, many
others are under and
the in the end it
will all even out.
You aren’t happy,
but you feel
stuck…what can you
do; you’ve got to
finish the project?
If you pull the plug
now, it becomes just
a heap of
uncompleted work;
you will loose
momentum, be
distracted from your
work and will end up
with yet a larger
headache. You decide
to bite the bullet
and sign off on the
change orders.
Truth be told…far
too many good
natured and
unsuspecting home
owners have been
down this bumpy
road. But what can
you do, how do you
build the home of
your dreams for a
fair and predicable
price? Here is some
practical advice….
First, I highly
recommend that large
scopes of work be
delivered under a
Design-Build
enterprise; dollars
will be maximized
under this
arrangement and
allows you to be in
control of the
project every step
of the way. Next, if
you are determined
to work under a
separate agreement
for the built
solution, have
several reputable,
competent and
capable contractors
competitively bid
the project…per
plans and
specifications,
under a Lump
Sum–Fixed Fee
Agreement. The price
will be competitive,
is guaranteed and
change orders will
be less frequent.
Lastly…if you are
determined to work
under a Cost Plus
arrangement be
forewarned….
Under a Cost Plus
agreement profit
incentives invite
the following: Less
on-site management
(reduced overhead
for the contractor,
more cost to you,
shoddy workmanship,
mistakes), a buddy
system of sub-trade
selection (higher
pricing,
inappropriate gifts
or referral fees, no
competition),
delayed and extended
schedules (padding
down time between
projects, increasing
profits, working on
other projects),
requests for
multiple change
orders (costs
exceeding a poorly
estimated and
managed project
expense), work
performed is on your
clock not theirs
(dramatically
increasing labor
costs, hiring of
incompetent
craftsman,
inaccurate or false
reporting of time,
material, equipment,
etc.), increased
cost of equipment
rentals (the longer
the equipment is on
site the more margin
paid the
contractor)…the list
goes on and on and
on.
At the very least…if
you are going to
move forward under a
Cost Plus
arrangement despite
the many pitfalls
and disadvantages,
require the
following:
i.) That each
itemized line of
expense be supported
with “units of
measure” (cubic
yards, square foot,
tons, board feet,
per item, allowance,
man-days, etc) and
the “price per
unit”, that can be
compared to the
architects take-off
and other competing
contractors
estimates.
Remember…in the
absence of these
“units”, the
estimate and thus
the proposal or
agreement is bogus!
ii.) After
confirming all units
of measure to the
plans, estimates,
etc. approve of the
amount(s) as an
“NTX” or a “Not to
Exceed” only. In
other words the
amount noted is the
cap…approval is not
granted for sums
exceeding this
amount. However,
this arrangement
will not guarantee
you a price that
will be less then
the sum proposed;
and in fact will
likely equal or
exceed the amount
noted in the desire
to earn all
available sums
within grasp of the
contractor.
iii.) Be leery of
work self performed
by a contractor that
can be competitively
bid for less by
outside sub-trades.
iv.) Watch for
material, finishes,
or equipment, etc.
substitutions that
reduce the cost that
are not translated
into a savings for
you or the project;
but rather improve
the contractor’s
margin of profit
only. e.g.: windows,
flooring, hardware,
roofing, furnaces,
etc., etc.
Wrapping up…many
contractors are
reputable, honest
and deserving of
praise and sums paid
for their service;
this example has
been provided in the
attempt to help the
unsuspecting from
becoming victims of
tactics by dishonest
business practices
known to exist in
the market place.
CONCLUSION
With over 27 years
of construction
specific and
professional service
experience, Dan
Joseph Architects is
ready to assist with
your project needs.
We have prepared a
list of
pre-qualified
contractors and
continue to
interview, audit
process and capacity
to meet the growing
list of tomorrows
demand. Give us a
call and discover
the joys and the
many advantages of a
Design-Build Team
for your next
project!
POINTS TO REMEMBER
1. A Design-Build
relationship keeps
all stake holders
actively involved as
“Single Source”
accountable from
concept to
completion.
2. Not all
architects are
capable of
delivering an
effective
Design-Build
service; qualify
experience, capacity
and diligence.
3. Design Build is
the most
competitive, timely
project delivery
system known, as
supported by
intensive study (see
attachment below)
4. When selecting a
Contractor, a
successful track
record over a number
of years is an
important benchmark;
but no less
important is the
utilization of a
proven process and
the comprehension to
a wide range of
related topics.
5. Most
importantly…predictable
project expenditures
require consistent,
verifiable means of
back checking; and
in the absence of
quantifiable
measures, your final
project cost will
most certainly
exceed your
expectations!
6. Stay away from
“Cost Plus”
agreements for large
scoped projects.
Click on the link
below to view Design
Build attachment:
http://www.djawest.com/DesignBuildBrochure.pdf
back
to top
|
LEED CERTIFICATION
FOR EXISTING HOMES
QUESTION:
My home isn’t new, what can I do to receive a LEED Rating?
ANSWER: Green Homes are healthier places to live, are better for the
environment and can save money. They have better air quality than
non-green homes; cost less to operate and significantly decrease the
negative impact of the home on the environment. Green homes are also
an immediate and measurable way individuals can make a difference in
the environment.
While a LEED rating is not available for existing homes "Re-Green"
is a program available for existing homes that will compliment the
release of LEED for Homes Certification; but is not itself a LEED-branded
rating system with a certification threshold and recognition levels.
It is a guide with educational resources for setting and achieving
performance based objectives, for sustainable residential
improvement projects.
The foundation of re-green remodeling is “performance–based systems
integration”: understanding and then capturing how a structure,
finish, furnishings and mechanical systems work together to make a
home safe, healthy, efficient, and durable. The six elements of
assessment are: building-site interfaces, home performance,
mechanical systems, interior spaces, materials and hazards.
Dan Joseph Architects can help save you money and to make your home
a healthier place to live. As “Single Source” accountable we will
provide you with a comprehensive building assessment, prepare
improvement options and approximate related cost for a performance
based integration response that is geared to your individual budget
and program need.
POINTS TO REMEMBER
1. “Green” homes are better then non-green homes.
2. “Re-green”…a LEED for Homes program will assist in achieving
performance based objectives.
3. Currently there is not a certification threshold available from
the USGBC for existing homes.
back to top
|
Home
/
Architects Journal Entry
/ Headwaters Camp Press
Release /
Projects
DJA Blog Topics
/
Links / LinkedIn
/
Contact
Copyright 2006 - 2010- all
rights reserved - Dan Joseph Architects, LLC
This web site and its contents are the protected copyright property of Dan
Joseph
Architects and cannot be used or copied in any way without written
permission.
|